Nowadays, one of the important and indispensable conditions for the effectiveness
and competitiveness of industrial companies is the high efficiency of manufacturing
and assembly. These enterprises based on different methods and tools systematically
monitor their efficiency metrics with Key Performance Indicators (KPIs). One of these
most frequently used metrics is Overall Equipment Effectiveness (OEE), the product
of availability, performance and quality. In addition to monitoring, it is also necessary
to predict efficiency, which can be implemented with the support of machine learning
techniques. This paper presents and compares several supervised machine learning techniques
amongst other polynomial regression, lasso regression, ridge regression and gradient
boost regression. The aim of this article is to determine the best estimation method
for semiautomatic assembly line and large batch size. The case study presented with
a real industrial example gives the answer as to which of the cumulative or rolling
horizon prediction methods is more accurate.